01/21/2019 the adjustment works of the HURIKAN 300 incinerator in Sakhalin were completed. At the moment, the installation is being prepared by the engineers of the Manufacturer for commissioning at the industrial waste of the slaughterhouse. The installation will be operated on biological waste at the place of their formation, which significantly optimizes the costs of dispose and increases the biological safety of the enterprise.
Ваша заявка принята!
Наш менеджер свяжется с Вами
в течение 2 минут!
Рабочее время 8:00-17:00 (МСК)