On January 14, the company “Eco-Spectrum” shipped the HURIKAN 300 incinerator plant, the equipment will be located in the Tyumen region.
This installation is characterized by the use of three ECOFLAM burners in the first chamber and one in the second chamber. Using the grate system. The presence of a two-section chimney, a new design of the bucket for loading from above and a rail mechanism for opening the “slide door” lid.
The unit will operate on diesel fuel, with two high-performance spare parts burners. The control panel heating was also applied and the GSM module was integrated.
A specialist of the Eco-Spectrum company will perform commissioning and training of equipment employees at the equipment work site.