ENG
ENG

ECO-SPECTRUM LLC PRODUCED 10 DAYS INCINERATION

Eco-Spectrum LLC, in order to establish the productivity of the mobile incinerator HURIKAN 1000on such waste as chips, wood dust produced 10 days incineration of waste, for which it was sent to the Sverdlovsk region to the place of waste generation. During incineration, a minimum-maximum rate of waste incineration was established, it was established at what speed and technical settings there was a complete absence of smoke and emissions. Having carried out the tests, the specialists of Eco-Spectrum LLC determined the features of incineration of this waste and developed a technical solution for waste loading with the auger system, and also the Customer has already proposed an automatic ash removal option in the HURIKAN 1000 incinerator for stationary execution.

HURIKAN 1000   HURIKAN 1000